North-East ShuttleMon-Fri
| Name | Type | Starts | Ends |
|---|---|---|---|
| Zina Pitcher, Ann, & Catherine Road Closures (ZPAC) | General | 05/04/2026 | 10/30/2026 |
DETOUR NOTIFICATION SHEET CURRENT ROUTE DETOURS & DETAILS Commuter North – 3 DETOURSDETOUR 1 – S State St & Packard St ClosureMon May 11, 2026 – Wed Jul 15, 2026; All Day After servicing the Intramural Building temporary stop on E Hoover Ave, buses will:
Tue May 26, 2026 – TBD; All Day
There will be no service to the Kinesiology Bldg or CCTC – Chem stops during this detour. Mon May 4, 2026 – Mon Aug 3, 2026; All Day After servicing the CCTC, buses will:
There will be no service to Couzens Hall on E Ann St during this detour. Commuter South – 3 DETOURSDETOUR 1 – North University Eastbound and Fletcher St (CCTC – Chem) Closure Tue May 26, 2026 – TBD; All Day
There will be no service to the Biomedical Science Research Bldg, Rackham Bldg, or CCTC – Chem stops during this detour. Mon April 27, 2026 – TBD; All Day
There will be no service to the East Quad Willard stop during this detour. DETOUR 3 – S State St & Packard St Closure Mon May 11, 2026 – Wed Jul 15, 2026; All Day After servicing the Michigan Union stop on South University, buses will:
There will be no service to the South Quad or Intramural Building stops during this detour. Crisler Express – 2 DETOURSDETOUR 1 – Zina Pitcher, Ann, & Catherine (ZPAC) Closure Mon Jun 8, 2026 – Sat Aug 1, 2026; All Day After servicing the CVC on Observatory, buses will:
There will be no service to the Biomedical Science Research Bldg during this detour. NOTICE – S Division St and Packard St Intersection Closure Wed May 20, 2026 – Mid-July; All Day Due to the intersection closure of S Division St and Packard St, Crisler Express buses will not be able to use S Division St to deadhead from Kipke to the Cancer Center. The suggested (not required) deadhead route is below:
Northwood – 2 DETOURSNOTICE 1 – North University Eastbound and Fletcher St (CCTC – Chem) Closure Tue May 26, 2026 – TBD; All Day Due to all CCTC traffic traveling through the Museum side, Northwood buses will observe their breaks in the cutouts on Washtenaw Ave for the duration of this detour to avoid congestion. NOTICE 2 – Construction at Couzens Hall and Lloyd/Observatory Stops Mon Jun 8, 2026 – TBD; All Day Northwood inbound can resume regular route after the Fuller Rd / Lot NC-78 stop. Due to construction on Observatory St, there will be no service to the Lloyd/Observatory stop. Passengers should use the temporary Couzens Hall stop on E Ann St until further notice. DETOUR 1 – Zina Pitcher, Ann, & Catherine (ZPAC) Closure Mon May 4, 2026 – Mon Aug 3, 2026; All Day After servicing the Power Center stop on Fletcher St, buses will:
There will be no service to the Zina Pitcher stop during this detour. Mon May 4, 2026 – Mon Aug 3, 2026; All Day ** Buses will observe their time point at the CVC ** After servicing the CVC on Observatory, buses will:
There will be no service to the Zina Pitcher, West Med @ Catherine, or Med Science Research Bldg II stops during this detour. Wall Street-NIB – 1 DETOURDETOUR 1 – Zina Pitcher, Ann, & Catherine (ZPAC) Closure Mon Jun 8, 2026 – Mon Aug 3, 2026; All Day After servicing the CVC on Observatory, buses will:
Service to the Zina Pitcher and Couzens Hall stops will take place at the temporary stops on E Ann St during this detour. |
|||
Bus Tracking
For live bus tracking, visit Magic Bus, select the route icon, and choose North-East Shuttle.
| Departure From | First Departure | Last Departure | Frequency |
|---|---|---|---|
| Monday-Friday | |||
| Zina Pitcher to EAAHC | 6:45 am | 8:00 pm | 15 minutes |
| VA to EAAHC | 6:50 am | 7:50 pm | 30 minutes |
| Plymouth Rd Park & Ride to Zina Pitcher | 6:15 am | 7:30 pm | 15 minutes |
| EAAHC to Zina Pitcher | 7:15 am | 7:15 pm | 15 minutes |
| VA to Zina Pitcher | 6:50 am | 7:50 pm | 30 minutes |
