Green Road-NW5 Loop Every Day
Name | Type | Starts | Ends |
---|---|---|---|
Green Road – NW5 Loop Changes (11/29) | General | 11/29/2020 | 05/01/2021 |
Beginning on 11/29, the hours of operation of the Green Road – NW5 Loop will be extended. The new last trip out of Art and Architecture will be 12:00 AM Monday-Friday and 12:15 AM on Saturday-Sunday. 8.5.2
|
|||
Transit Service Change: Extended Student Break (Sunday, November 29 – Saturday, January 16, 2021) | General | 11/29/2020 | 01/17/2021 |
The following safety measures remain in place with the transit service change:
Campus Routes From Sunday, November 29 to January 16, 2021, the schedules and frequencies will be adjusted for Campus routes: Bursley-Baits Loop, Campus Connector, Green Rd-NW5 Loop, Northwood Loop, Oxford-Markley Loop and Stadium-Diag Loop. Bursley-Baits Loop: First Trip – 7:15 am Last Trip – 12:00 am Frequency – 15 minutes Campus Connector: First Trip Museum – 8:00 AM First Trip Pierpont – 8:02 AM Last Trip Museum – 12:00 AM Last Trip Pierpont – 12:00 AM Frequency – 4 minutes 8:00 AM until 8:30 PM, 5 minutes from 8:35 PM – 12:00 AM Green Rd-NW5 Loop: First Trip Green Road – 6:30 AM First Trip Pierpont – 6:45 AM Last Trip Green Road – 11:45 PM Last Trip Pierpont – 12:00 AM Frequency – 15 minutes Northwood Loop: First Trip – 7:15 AM Last Trip – 12:00 AM Frequency – 15 minutes Oxford-Markley Loop: First Trip Oxford – 8 AM Last Trip Oxford – 11:45 PM Frequency – 7-8 minutes 8 AM – 8:30 PM, 15 minutes 8:30 PM – 11:45 PM Stadium-Diag Loop: First Trip SC-7 – 8:00 AM First Trip CCTC – 8:10 AM Last Trip SC-7 – 12:00 AM Last Trip CCTC – 12:10 AM Frequency 10 minutes 8:00 AM – 8:30 PM, 15 minutes 8:30 PM – 12:00 AM Michigan Medicine Routes Michigan Medicine routing, including Crisler Express, Glazier Express, Wall Street and East Ann Arbor routes will continue without schedule changes. The Med Express outbound route will no longer service the NCRC (south shelter) beginning at 7:55pm daily (alternative stop provided at Hubbard/Hayward). Beginning on Monday, November 30, Transit Services will operate the Crisler and Glazier Express services in blue buses. After-Hours/Other Services
Over the Winter Holiday Season (December 23 – January 3), there will be additional modifications to parking and transportation services–stay tuned for information in the coming weeks. 8.5.2
|
|||
Beal Avenue ITS Conduit Project | Detour | 12/15/2020 | 02/01/2021 |
Beginning on 12/15 construction will begin on ITS duct banks along Beal Avenue between Bonisteel Boulevard and Fuller Street. It is anticipated that weather dependent, the work should be finished by the middle of January. During this time, there will be partial lane closures on southbound Beal Avenue east of Bonisteel Avenue and on Beal Avenue at Fuller Street. Northbound Beal Avenue traffic will be maintained throughout the projectââ¬â¢s duration. The GNW will need to detour. GREEN ROAD – NW5 LOOP – 1 DETOUR DETOUR 1 – Beal Avenue ITS Conduit Project DEC 15 – Middle of January; ALL DAY (Inbound/towards Art and Architecture) After servicing the stop at Hubbard/Hayward inbound buses will:
There will be no inbound service at BME. (Outbound/towards Green Road) After servicing the Architecture buses will:
8.5.5
|
Days | Departure From | In the Direction of | First Departure | Last Departure | Frequency |
---|---|---|---|---|---|
Mon – Fri | Green Road | Pierpont | 6:30 am | 8:15 pm | 15 minutes |
Mon – Fri | Pierpont | Green Road | 6:45 am | 8:30 pm | 15 minutes |
Sat – Sun | Green Road | Pierpont | 8:00 am | 8:00 pm | 30 minutes |
Sat – Sun | Pierpont | Green Road | 8:15 am | 8:30 pm | 30 minutes |
Bus Tracking
For live bus tracking, visit Magic Bus, select the route icon, and choose Green Road-NW5 Loop.